Project1
Inland Container Port
-
Change of use from meat works to a hazardous substance facility.
-
Remediate asbestos contamination in the site.
-
Full turn key hazard facility including:Civil, Security
-
Using existing services and upgrading them:Hydro
-
Major excavation and remediation within a high seismic zone.
-
Bulk transfer unloading and loading.
-
Works completed in stages.
-
All works were completed without incident.
-
Works were completed while maintaining an operational site.
-
Planning the project and working with onsite contractors from three different countries
-
Design and construct mass footings for very large water storage tanks.
-
Completing a full and approved civil design package, specifically for an environmentally sensitive “Cat 5” cyclone area.
-
Very remote location and importing 40% of all materials.
-
Offshore work while complying to NZAS1596.
-
Working and maintaining the operation of the facility with 264 container movements per day, 24 hours a day, 7 days a week.
-
Including New Zealand, Fiji and USA standards in the design and value engineering the project.
-
14,000m2 of high mpa concrete in remote location.
-
Dewatering.
-
Shoring and underpinning.